EasyManua.ls Logo

Furuno BR-500 - Cable Fabrication and Fixing

Furuno BR-500
93 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4. INSTALLATION
4-12
How to fabricate and fix cables to the Processor Unit
L 3
L=Distance from cable clamp
to terminal connection
Armor
Sheath
Cut sheath.
6
Connect cores to
WAGO terminal
block.
MPYC-2
ø
= 10.0 mm
Armor
Insulator
Sheath
Conductor
S = 1 mm
2
ø = 1.29 mm
MPYC-7
ø
= 13.2
mm
DPYC-1.5: ø = 11.7 mm
DPYC-2.5: ø = 12.8 mm
Armor
Sheath
Conductor
DPYC-1.5:
S = 1.5 mm
2
ø
= 1.56 mm
DPYC-2.5:
S = 2.5 mm
2
ø
= 2.01
mm
L=Distance from cable clamp
to terminal connection
L=Distance from cable clamp
to terminal connection
Remove paint.
L 50
Shield
Cut vinyl sheath.
Pull out cables from shield;
solder vinyl wire to shield.
Vinyl tape
Set this part in cable clamp.
TTYCS-1
ø = 10.1 mm
Armor
Sheath
Shield
Conductor
S = 0.75 mm
2
ø
= 1.11 mm
Power cables for Processsor Unit (DPYC-1.5 (AC power), DPYC-2.5 (DC power))
MPYC-2 (Operator Fitness), MPYC-4
*1
(Motion Detector, Flash Beacon)
MPYC-7
*2
(Cabin Panel, Timer Reset Panel)
TTYCS-1 (VDR)
Crimp-on lug
Inner diameter ø4
Outer diameter ø7
Set this part in
cable clamp.
Connect cores to
WAGO terminal
block.
*1
Also available for
Cabin Panel connection.
*2
Use MPYCY-7 for
Watertight Cabin
Panel.
Vinyl tape
Set this part in
cable clamp.
L
6
Armor
Cut the sheath.
Vinyl tape
Sheath
1
MPYC-4
ø
= 11.2
mm

Table of Contents

Other manuals for Furuno BR-500

Related product manuals