EasyManuals Logo
Home>Furuno>Marine Radar>FELCOM 15

Furuno FELCOM 15 Installation Manual

Furuno FELCOM 15
51 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #27 background imageLoading...
Page #27 background image
21
5. CHANGING POWER SUPPLY
SPECIFICATIONS
The AC-DC power supply PR-240 is shipped ready for connection to a 200-230 VAC ship’s
mains. If the ship’s mains is 100 VAC-115 VAC, change the tap connection and terminal
board connection as below. Attach a label supplied as accessories to the front panel
according to the ship’s mains.
Ship’s mains Tap connection Terminal board Label
200-230 VAC SEL 230 V Below (a)
200-230 VAC 2.2-1.7 A
1φ 50/60 Hz
100-115 VAC SEL 115 V Below (b)
100-115 VAC 3.2-2.6 A
1φ 50/60 Hz
Remove screw
and cover.
Cover
1
2
3
4
5
6
7
8
SEL
115V
SEL
230V
1
2
3
100-115 VAC
1
2
3
200-230 VAC
(a)
(b)
AC FAIL:Connect to Alarm system.
Output Setting: Normal Close
Set plug to 2 & 3 pins of J4 (Factory setting)
Normal Open
Set plug to 1 & 2 pins of J4
AC Power Switch
(When connecting DC input, note that the DC power is supplied
even though this switch is turned off.)
Heat sink
Tap connection
(Pull out to disconnect.)
Front panel
Terminal board
Grey
Black
Grey
Black
Attach appropriate label.
Front panel
Coil
Relay
3
1
2
J4
Note: The DC output load must be less than 8A.

Other manuals for Furuno FELCOM 15

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Furuno FELCOM 15 and is the answer not in the manual?

Furuno FELCOM 15 Specifications

General IconGeneral
BrandFuruno
ModelFELCOM 15
CategoryMarine Radar
LanguageEnglish

Related product manuals