OPM_LPS_31E_8K0_20K_1GB_V010.doc 28/40 Operating Manual LP 31 / 8-10-15-20 kVA
4.4 TEST SCREENS
These screens show the test procedure, either started from the service menu (front panel keys)
or via the UPS monitoring software (ComConnect Port).
The upper line indicates the kind of test, the second line its proceeding.
Upper lines:
GENERAL SYSTEM (Overall test of system).
QUICK BATTERY (Quick battery test).
CALIBRATE BAT (Deep discharge battery test).
BYPASS (Bypass test).
Lower lines:
TEST START The test will start soon.
TEST ACTIVATED The test is running.
TEST SUCCESSFUL The test has been completed successfully.
TEST FAILED The test has not been completed successfully.
4.4.1 Battery Test, general
Automatic test The LP 31 UPS conducts periodic automatic battery tests to ensure
that the batteries and the wiring are healthy and able to support power
failures.
The tests do not cause any interruption in the function of the unit and
are conducted after every 500 operating hours.
Manual test A manual battery test can be activated:
- either through an interface kit, via the ComConnect Interface Port
(please refer to the manual of your interface package), or
- via the front panel: see below.
4.4.2 Quick Battery Test
From the standard menu first enter the service menu (press “-” and “enter/reset
simultaneously during 2 seconds).
Subsequently press “-” until the following screen appears:
QUICK BATTERY
TEST PRESS ENTER Key enter/reset confirms the selection, and the screen
shows:

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the GE LP 31 and is the answer not in the manual?

GE LP 31 Specifications

General IconGeneral
BrandGE
ModelLP 31
CategoryUPS
LanguageEnglish

Related product manuals