,167$//$7,21
Notes:
- The flow/return sensor cables (identified by a
flow/sensor return sensor tag) are already con-
nected to the RVA 47s and are at stand-by in the
boiler in order to facilitate the assembly.
For the electrical connection of the sensors and
pumps, see section V - BASIC SETTING OF THE
THR 10-100.
/LTXLGZDVWHHYDFXDWLRQ
The 4 tubes liquid waste evacuation tubes (item
no. 27) (condensate evacuation, drain and bleeds)
must be connected to an accessible siphon.
A condensate processing system can be installed in
the boiler according to local and national regulation
requirements.
This accessory makes it possible to return the pH to
a neutral value prior to network evacuation of liquid
waste.
27
)LJ
)LJ