9,&200,66,21,1*
$17,&25526,213527(&7,21)257+(,167$//$7,21
A water conditioning product (INIBAL) must be ad-
ded into the heating circuit when the installation is
filled with water.
2QO\XVH,1,%$/IDLOLQJZKLFKWKHERL
OHUVKHOOZRXOGQRWEHJXDUDQWHHG,1,
%$/ HQVXUHV SURWHFWLRQ IURP
FRUURVLRQIRUPXOWLPHWDOFLUFXLWVIURP
JDVVLQJ
INIBAL DOSAGE: one litre to one hundred litres.
Note:
- INIBAL must be ordered separately.
)52673527(&7,21$1'$17,&25526,21)257+(,167$//$7,21
2QO\XVH,1,%$/$17,)5((=(IDLOLQJ
ZKLFK WKH ERLOHU VKHOO ZRXOG QRW EH
JXDUDQWHHG ,1,%$/ $17,)5((=( HQ
VXUHVSURWHFWLRQIURPIURVWPXOWLPHWDO
FLUFXLWFRUURVLRQDQGJDVVLQJ
INIBAL ANTIFREEZE DOSAGE
Number of litres of INIBAL ANTIFREEZE to be ad-
ded to the central heating circuit to reach the protec-
tion temperature (left hand column in table)
according to its capacity given in litres (top row of ta-
ble).
Note:
- INIBAL ANTIFREEZE must be ordered separa-
tely.
),//,1*7+(,167$//$7,21:,7+:$7(5
- The installation will have to be rinsed before the
boiler is filled with water. Installation decantation
should be provided for.
- To ensure proper boiler bleeding during the in-
stallation’s filling stage:
• check that the isolation valves are open (item
no. 8, no. 9 - THR 10-100 C models, item
no. 27 - THR 10-100 CS models),
• fill the installation,
• do not forget to add INIBAL or INIBAL ANTI-
FREEZE,
• check the leaktightness of the circuit,
• bleed the whole installation, in particular the ra-
diators,
• readjust installation pressure to about 1.5 bars.
!
!
7HPSHUDWXUH
SURWHFWLRQ
OLPLW
,QVWDOODWLRQFDSDFLW\OLWUHV
&
18 37 55 74 92
&
22 44 66 88 110
&
25 50 75 100 125
&
28 55 80 110 137
&
30 60 90 120 150
&
32 64 96 128 160
&
34 68 100 136 170
&
36 72 108 144 180
&
38 76 114 152 170
&
40 80 120 160 200
&
42 84 126 168 210
&
44 88 132 176 220
9827
8
27
$=:
)LJ