Appendix A - User Interface Display
82 3A2776K
Totalizers and Job Number
Use this screen view the grand and batch totals for each
pump and both pumps combined. The units of
measurement are displayed on the bottom of the screen
and displayed in the units of measurement selected
during setup.
Grand total is the amount of material the system has
dispensed during its lifetime. Batch total is the amount of
material dispensed since the last user reset.
A job number can be entered at the beginning of each
spray job. This helps to organize the USB spray log.
Clear Batch Totalizer
To clear the batch totalizer values for A, B, and A+B,
press to set all values to zero.
Change Job Number
1. Press to highlight the first digit. Press and
to change the number and press and
to move to the next digit. Press to save
the number or to cancel.
Maintenance 1 Screen
Use this screen view setpoints for the amount of
material that needs to move through both pumps and
dosing valves that will result in a maintenance warning.
Maintenance 2 Screen
Use this screen view number of days between changing
the main incoming air filter before a reminder advisory is
issued.
Reset Maintenance Counter
1. Press and to scroll through and select the
maintenance field to reset.
2. Press to reset the maintenance counter to
zero.
Icon Function
Displays batch total and grand total for
pump A. The grand total is displayed at
the top, and the batch total is displayed at
the bottom.
Displays batch total and grand total for
pump B. The grand total is displayed at
the top, and the batch total is displayed at
the bottom.
Displays batch total and grand total for
both pumps combined. The grand total is
displayed at the top, and the batch total is
displayed at the bottom.
Displays job number for each spray
period.
Number of hours system has been
running