Multi VRF Floor Standing Indoor Unit
13
5.1 Connect Cables and Terminals of Wiring Board
Connection of Wire and Patch Board Terminal.
(1) The connection of wire (as shown in Fig 5.1).
1) Strip about 25mm insulation of the wire end by stripping and
cutting tool.
2) Remove the wiring screws on the terminal board.
3) Shape the tail of wire into ring by needle nose plier, and keep the
gauge of ring in accordance with screw.
4) Use the screwdriver for tightening the terminal.
(2) The connection of stranded wire (as shown in Fig 5.2).
1) Strip about 10mm insulation of the end of stranded wire by
stripping and cutting tool.
2) Loosen the wiring screws on terminal board.
3) Insert the wire into the ring tongue terminal and tighten by crimping
tool.
4) Use the screwdriver for tightening the terminal.
Fig 5.1 Fig 5.2

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Gree GMV-ND140L/A-T and is the answer not in the manual?

Gree GMV-ND140L/A-T Specifications

General IconGeneral
BrandGree
ModelGMV-ND140L/A-T
CategoryAir Conditioner
LanguageEnglish

Related product manuals