7.5.2 Operation Test
1.Before Operation Test
(1)Do not switch on power before installation is nished completely.
(2)Electric wiring must be connected correctly and securely.
(3)Cut-off valves of the connection pipes should be opened.
(4)All the impurities such as scraps and thrums must be cleared from the unit.
2.Operation Test Method
(1)Switch on power and press "ON/OFF" button on the wireless remote controller to start the operation.
(2)Press MODE button to select the COOL, HEAT (Not available for cooling only unit), FAN to check whether the operation is
normal or not.
7.6 Installation and Maintenance of Healthy Filter
7.6.1 Installation of Healthy Filter
1.Lift up the front panel from its two ends, as shown by the arrow direction, and then remove
the air lter.(as shown Fig.a)
2.Attach the healthy lter onto the air lter, (as shown Fig.b).
3. Install the air lter properly along the arrow direction in Fig.c, and then close the panel.
Fig. a
filter
Air filter
Fig. b
Fig. c
Healthy
7.6.2 Cleaning and Maintenance
Remove the healthy lter and reinstall it after cleaning according to the installation instruction. Do not use brush or hard objects to
clean the lter. After cleaning, be sure to dry it in the shade.
7.6.3 Service Life
The general service life for the healthy lter is about one year under normal condition. As for silver ion lter, it is ineffective when its
surface becomes black (green).