44
Super Match
1.8 Installation
1. BEFORE INSTALLATION <Don't discard any accessories until comp>
■ Determine the way to carry unit to installation place.
■ Don't remove packing until unit reaches installation place.
■ If unpacking is unavoidable, protect unit properly.
2. SELECTION OF INSTALLATION PLACE
(1) Installation place shall meet the following and agreed by customers:
■ Place where proper air ow can be ensured.
■ No block to air ow.
■ Water drainage is smooth.
■ Place strong enough to support unit weight.
■ Place where inclination is not evident on ceiling. Enough space for maintenance.
■ Indoor and outdoor unit piping length is within limit. (Refer to Installation Manual for outdoor unit.)
■ Indoor and outdoor unit, power cable, inter unit cable are at least 1 m away from T.V. radio. This is helpful to avoid
picture disturbance and noise. (Even if 1 miss kept, noise can still appear if radio wave is strong)
(2) Ceiling height
Indoor unit can be installed on ceiling of 2.5-3m in height. (Refer to Foeld setting and Installation Manual of
ornament panel.)
(3) Install suspending bolt.
Check if the installation place is strong enough to hold weight. Take necessary measures in case it is not safe.
(Distance between holes are marked on paper pattern. Refer to paper pattern for place need be reinforced)
Model H
AB09CS1ERA AB12CS1ERA(S)
AB18CS1ERA(S)
320
AB24ES1ERA(S) AB28ES1ERA(S) 300
AB36ES1ERA(S) AB48ES1ERA(S)
AB60CS1ERA(S) AB60ES2ERA(S)
335