Figure 4-4 Surface Mounng without Gang Box
4.1.4 Flush Mounng with Juncon Box
The device supports ush mounng with juncon box.
Before You Start
●
Make sure all related equipments are
power-o during the installaon.
●
Accessories that you need to prepare for installaon: Juncon box and mounng
template.
●
Tools that you need to prepare for
installaon: Drill (ø2.846) and gradienter.
●
Purchase the protecve shield before installaon.
Steps
1. Cave the installaon hole and pull the cable out.
Note
The dimension of the installaon hole should be larger than the juncon box.
2. Sck the mounng template into the installaon hole.
3. Insert the juncon box into the hole and x it with 4 screws according to the
screw holes.
4. Insert the door
staon into the juncon box, and x it with set screw.
Video Intercom Analog Bundle User Manual
17