Figure 4-5 Flush Mounng with Juncon Box
4.1.5 Flush Mounng with Gang Box(Type I)
The device supports ush mounng with gang box.
Before You Start
●
Make sure all related equipments are
power-o during the installaon.
●
Accessories that you need to prepare for
installaon: Gang box and mounng
plate.
●
Tools that you need to prepare for
installaon: Drill (ø2.846) and gradienter.
●
Purchase the protecve shield before installaon.
Steps
1. Cave the installaon hole in the wall.
Note
The dimension of the installaon hole should be larger than the gang box.
2. Insert the gang box to the hole chiseled on the wall.
3. Fix the
mounng plate to the gang box with 2 screws.
Note
The dimension of the gang box is 75mm(width) × 75 mm(length) × 46 mm(depth),
the le and right holes will be applies.
Video Intercom Analog Bundle User Manual
18