1 About This Document
Overview
This document describes the commissioning process after device replacement to
connect new devices to the smart PV management system (SmartPVMS) or a
third-party management system in the FusionSolar smart PV solution.
Intended Audience
This document is intended for photovoltaic (PV) plant operators and
qualied
electricians.
Symbol Conventions
The symbols that may be found in this document are dened as follows.
Symbol
Remarks
Indicates a hazard with a high level of risk
which, if not avoided, will result in death or
serious injury.
Indicates a hazard with a medium level of risk
which, if not avoided, could result in death or
serious injury.
Indicates a hazard with a low level of risk
which, if not avoided, could result in minor or
moderate injury.
Indicates a potentially hazardous situation
which, if not avoided, could result in
equipment damage, data loss, performance
deterioration, or unanticipated results.
NOTICE is used to address practices not related
to personal injury.