Measurement instruments
Clamp meter Multimeter Network tester
-
Engineering auxiliary materials
Label Cable tie Cotton cloth Heat-shrink
tubing
Insulation tape
- - -
Other tools
Electrician's knife Tweezers Brush Vacuum cleaner
4.3 Installing UPS
Procedure
1. Visually inspect the UPS packing box for shipping damage.
2. Open the UPS package, compare with the packing list to check all
attachments are complete for UPS.
UPS2000-A-(1 kVA-3 kVA)
User Manual 4 Installation and Cable Connection
Issue 17 (2024-01-30) Copyright © Huawei Digital Power Technologies Co., Ltd. 37