UPS2000-G-(1 kVA-3 kVA)
User Manual
3 Installing the UPS
Copyright © Huawei Technologies Co., Ltd.
21
3 Installing the UPS
3.1 Installation Preparations
Floor Loading Capacity
The floor can bear the weight of the UPS and its optional components. In the case of rack
installation, ensure that the floor can also bear the weight of the rack.
Installation Requirements
Do not install the UPS in high temperature, low temperature, and damp areas.
The installation position is far away from water sources, heat sources, and inflammable
materials. The UPS is free from direct sunlight, dust, volatile gases, corrosive materials,
and salty air.
Do not install the UPS in environments with conductive metal scraps in the air.
The optimal operating temperatures for batteries are 2030°C. Operating temperatures
higher than 3C shorten the battery lifespan, and operating temperatures lower than
20°C reduce the battery backup time.
Dimensions
The space allocated for UPS installation has the combined dimensions of the UPS and its
input and output socket installed on the rear panel. The depth of the space is the depth of
the UPS plus about 100 mm.
Reserve a clearance of at least 500 mm respectively from the front and rear panels of the
UPS to the wall or adjacent equipment to facilitate ventilation and heat dissipation.

Other manuals for Huawei UPS2000-G-2KRTL

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Huawei UPS2000-G-2KRTL and is the answer not in the manual?

Huawei UPS2000-G-2KRTL Specifications

General IconGeneral
BrandHuawei
ModelUPS2000-G-2KRTL
CategoryUPS
LanguageEnglish

Related product manuals