6.0 Boiler operation
Before operating the appliance, there are some important pre-igntion checks that need to be
performed. For more information, see Before operating the boiler on page 63. To understand the boiler
start-up process, see Sequence of Operation on page 122.
Start-up Checklist Check
Followed lighting and shutting down procedure.
□
Tested the ignition safety shutoff function (see Testing the ignition safety shutoff on page
66).
□
Checked the appliance's fuel source, and if necessary, performed a fuel conversion using
the appropriate P-kit.
□
Performed gas pressure test by Measuring the inlet gas pressure on page 72.
□
Tested efficiency of the appliance and made necessary adjustments by Performing a
combustion test and adjustment.
□
6.1 Lighting and shutting down the boiler