EasyManuals Logo
Home>IDEAL>Boiler>C24

IDEAL C24 User Manual

IDEAL C24
64 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #20 background imageLoading...
Page #20 background image
20
INSTALLATION
Independent - Installation and Servicing
FLUE OUTLET
16
INSTALLING THE FLUE
FITTING FLUE THROUGH THE WALL
1. Measure wall thickness and add 14mm.
2. Measure from the outer terminal lip towards the end of outer ue, place a
small location mark at the dimension acquired at point 1.
3. Fit external black wall seal ensuring the inside of the outer lip is in contact
with the terminal lip you have been measuring from (see g 1)
4. For an internal t, place ue terminal in the centre of the 5” drilled hole
in the wall. Apply pressure and lightly move the ue left to right or up
and down. This will cause the outer ange to fold in and allow the ue to
pass through the wall.
5. Push through a further 65mm. This will allow the outer ange to return
to its original shape.
6. Pull back the ue until the location mark point 1 is level with the internal
face of the wall.
Note. If the location mark is not visible then the ue is not pulled back
far enough to obtain the correct seal. If the location mark has passed
the face of the wall the ue has been pulled to far back and the outer
wall seal will have been dislodged from its mounting and will need to be
retted.
7. Ensure the seam and the outlet terminal are at the top and tted as shown.
Note. If less than 50% of the length of the ue is internal the ue should be
tted from outside.
FITTING THE TURRET
1. Ensure the rubber seal is tted correctly on the appliance manifold and that all ue seals are undamaged.
2. Hold the ue rmly and push the turret on until it has travelled 30mm on to the ue pipe and is fully engaged. Make sure the
ue has not rotated or moved forward during tting and the ue seam is upper most.
3. Push the turret into the manifold ensuring the upper plastic lip is ush with the top of the manifold.
4. Fully engage the clamp location section into the manifold location holes. Rotate down on to turret ange.
5. Secure clamp to appliance using securing screw.
6. Ensure all sample points are accessible and all sample plugs and caps are tted.
Ensure lip of wall seal is positioned
over step on plastic nose of flue terminal
(note, seal is cut away for clarity)
Terminal Lip
Wall Seal Lip
Rubber
Terminal
Wall Seal
Terminal
MUST be
fitted as
shown
Retaining
screw
Clamp Lugs
Sample points
Flue Outlet
C
A
A - Duct Assembly
B - Flue Turret
C - Turret Clamp
D - Seal
Flue Outlet
D
B
Fig 1

Other manuals for IDEAL C24

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the IDEAL C24 and is the answer not in the manual?

IDEAL C24 Specifications

General IconGeneral
BrandIDEAL
ModelC24
CategoryBoiler
LanguageEnglish

Related product manuals