INSTALLATION
Viceroy GT Range - Installation 9
DESLUDGING
Desludging hole
threaded 2 1/2
A desludging hole of Ø 11/2 supplied with a plug is
provided in the lower part of the boiler to enable sludge to be
drained out. The installer can fit 1/4 turn valve.
Draining sludge involves the loss of significant quantities of
water from the system, which must be refilled after the
procedure.
Comment: Any replacement of boilers in an old system must
include a careful washing out of the full installation. Fit a
sludge trap on the return and close to the boiler.
5 CHIMNEY CONNECTION
As the Viceroy GT is a high performance boiler, the
temperature of the flue gases may be less than 160°C. The
installer ought to take all precautions (padding out, casing, T
for draining condensation) in order to avoid deterioration of
the chimney.
If necessary, the baffles of the 4 upper smoke chambers may
be partially removed with a resulting increase in temperature
of the flue gases.
8229-EN-07
8219-EN-21
For latest prices and delivery to your door visit MyTub Ltd - 0845 303 8383 - www.mytub.co.uk - info@mytub.co.uk

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the IDEAL Viceroy GT Series and is the answer not in the manual?

IDEAL Viceroy GT Series Specifications

General IconGeneral
BrandIDEAL
ModelViceroy GT Series
CategoryBoiler
LanguageEnglish

Related product manuals