EasyManuals Logo
Home>jcb>Portable Generator>G220RS

jcb G220RS User Manual

jcb G220RS
32 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #18 background imageLoading...
Page #18 background image
18 Please consult your manual for full information or consult your local dealer.
Control panel – DSE 8610
Operation
Single generator, controlled manually through its
genset controller. Load is monitored by the
operator.
Starting Procedure
Perform all the pre-start checks before starting
the generator.
1. Turn on the digital controller switch.
2. Wait for few seconds, to allow the controller
to power up and display to stabilise.
3. Make sure that the power on LED (Light
Emitting Diode) is illuminated on earth
leakage trip and there is no trip active where
required.
4. Make sure that the main power supply
MCCB is switched off.
5. Check that the emergency stop button is fully
out, if necessary twist to reset the button.
6. Complete all pre-start, system and engine
checks.
7. Press the start button and the machine will
start in manual.
8. The engine will run up to speed and stabilise.
9. Check that the machine operation is correct
using the screen information.
10. Make sure the power on LED is illuminated on
earth leakage trip and there is no trip active.
11. Turn on the main power supply MCCB.
12. The generator can now be loaded.
13. If the earth leakage relay trips at this point
consult the site electrical installation engineer.
Before Stopping
1. Check with other personnel on the job site and
let them know that power is being turned off.
2. Make sure that the power shutdown will not
create any hazards by turning off devices such
as pumps, heaters, or lights that may need to
be kept on.
Stopping Procedure
Perform the procedure below to stop the generator:
1. To stop the generator, remove any
electrical loads.
2. Turn the main power supply MCCB to
off position.
3. Press the stop button the generator will
now stop.
AUTO AND LOAD SHARING
OPERATION: Remote start and
synchronizing multiple sets must
only be set up by a suitably trained
and competent person. Please refer
to the operator manual for more
detailed instructions.

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the jcb G220RS and is the answer not in the manual?

jcb G220RS Specifications

General IconGeneral
Brandjcb
ModelG220RS
CategoryPortable Generator
LanguageEnglish

Related product manuals