Section 4 : Operation
4-34 5376000253
5. Install the grid recovery sheave
onto the back side of the grid
crossbar and secure with the
pins (1) and hair pins (2).
6. Remove the wire rope retaining
pin from the grid recovery
sheave.
7. Unwind some wire rope and run
the wire rope hook through the
recovery sheave.
8. Install the wire rope retaining
pin in the hole below the sheave
to retain the wire rope. You are
now ready for pulling.
9. After you have completed your
pull, apply the towed vehicles
parking brake or use blocks
or tie the work down if there
is any question about stability.
Remove the cable from the grid
sheave and remove the grid
sheave from the grid and store
in your toolbox.
1
2