Jetson
www.JetsonHVAC.com
50
type anchor bolt will make removal of a unit easier
if required.
If the floor is warped, uneven or in poor condition,
make necessary repairs before positioning the unit.
Once the unit is in place, it should be level within
1/8 inch side-to-side (width) and 1/8-inch front-to-
back (depth).
Clearances
Provide adequate space around each unit for
unrestricted Spreader Bar access for installation
and maintenance. Unit dimensions
are given in the Dimensions and Weights chapter.
It is critical that adequate space is provided for
service and maintenance of evaporator, condenser
and compressor. A minimum of 36 inches above
the unit is recommended for effective compressor
service. A minimum clearance of 3 ft.-6 inches is
required to open the control panel door.
Important: In all cases, local codes will take
precedence over these recommendations.
Ventilation
Provisions must be made to remove heat generated
by unit operation from the equipment room.
Ventilation must be adequate to maintain an
ambient temperature lower than 125°F.
Drainage
Front View
Locate the unit near a large capacity drain for
drain-down
Spreader
during shutdown or repair.
Handling
FWCD units are shipped stretch-wrapped and
bolted to a shipping skid unless special packaging
is arranged.
The skidded unit can be moved by using a fork
truck of suitable capacity. See Dimensions and
Weights chapter for unit weights.
When moving the unit, the lifting forks must be
positioned under the shipping skid as wide as
possible. Lift the unit and move it to the desired
location.
Once the unit is at the installation location,
remove the stretch wrap. Inspect the unit for
damage and report if damage is found.
Optional “ship loose” items may be inside the
control box, attached to the skid or shipped
separately depending on options selected.