Shut Down
Normal Unit Shutdown
Extended Shutdown Procedure
If the system is taken out of operation for long
periods of time, use this procedure to prepare the
system for shutdown.
1. Test condenser and high side piping for
refrigerant leakage.
2. Open electrical disconnect switches for
evaporator water pump. Lock the disconnect
in an open position.
3. Open the unit main electrical disconnect and
unit- mounted disconnect and lock in open
position.
Unit Restart
Unit Restart After Extended Shutdown
Use this procedure to prepare the system for restart after an
extended shutdown.
CAUTION
Compressor Failure!
To protect compressors from premature failure
the unit must be powered and crankcase heaters
energized at least 24 hours BEFORE
compressors are started.
Figure 25 Normal unit shutdown

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Jetson FWCD Series and is the answer not in the manual?

Jetson FWCD Series Specifications

General IconGeneral
BrandJetson
ModelFWCD Series
CategoryChiller
LanguageEnglish