Day One+
EX4100
IN THIS GUIDE
Step 1: Begin | 1
Step 2: Up and Running | 7
Step 3: Keep Going | 11
Step 1: Begin
IN THIS SECTION
Meet the EX4100 Ethernet Switches | 2
Install the EX4100 | 3
Power On | 6
In this guide, we provide a simple, three-step path, to quickly get you up and running with your new EX4100 switch.
We’ve simplied and shortened the installaon and conguraon steps, and included how-to videos. You’ll learn how to
install an AC-powered EX4100 in a rack, power it up, and congure basic sengs.
NOTE: Are you interested in geng hands-on experience with the topics and operaons covered in this guide?
Visit Juniper Networks Virtual Labs and reserve your free sandbox today! You’ll nd the Junos Day One
Experience sandbox in the stand alone category. Because EX switches are not virtualized, in the demonstraon,
focus on the virtual QFX device. Both the EX and QFX switches are congured with the same Junos commands.