OPERATION
TRANSPORTATION
OPERATION
TRANSPORTATION
5. Pass wire ropes between the 1st and 2nd track rollers from the
front and between the 1st and 2nd track rollers from the rear.
However, for machines equipped with a full roller guard for the
track roller, pass the wire rope under the track.
6.
Set the lifting angle (A) of the wire rope to 30° to 40°, then lift
the machine slowly.
7. After the machine comes off the ground, check the hook
condition and the lifting posture, and then lift slowly.
3 - 187

Table of Contents

Other manuals for Komatsu PC300-8

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Komatsu PC300-8 and is the answer not in the manual?

Komatsu PC300-8 Specifications

General IconGeneral
BrandKomatsu
ModelPC300-8
CategoryExcavators
LanguageEnglish

Related product manuals