EasyManuals Logo

KTM 250 XC-W TPI 2019 User Manual

KTM 250 XC-W TPI 2019
176 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #144 background imageLoading...
Page #144 background image
18 SERVICE WORK ON THE ENGINE
142
E00917-10
Main work
Remove protection cap
1
of the diagnostics connector.
E00819-11
Put throttle grip
2
into full throttle position and secure.
E00918-10
Plug in wake-up connector
3
for priming the oil pump to the
diagnostics connector
4
.
The combination instrument lighting is activated.
Info
The connector is included as part of the motorcycle's
separate enclosure.
Wait for at least five seconds.
Release the fixing means from the throttle grip.
The oil pump is timed.
Info
The oil pump is actuated at various speeds.
The procedure is clearly audible.
Wait until you can no longer hear the oil pump working.
Disconnect the wake-up connector from the diagnostics con-
nector.
M01515-10
Check whether air bubbles are visible in the hose
5
.
» If air bubbles are visible:
Repeat the entire procedure until air bubbles are no
longer visible.
Mount protection cap on the diagnostics connector.
Finishing work
Mount the seat. ( p. 80)

Table of Contents

Other manuals for KTM 250 XC-W TPI 2019

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the KTM 250 XC-W TPI 2019 and is the answer not in the manual?

KTM 250 XC-W TPI 2019 Specifications

General IconGeneral
BrandKTM
Model250 XC-W TPI 2019
CategoryMotorcycle
LanguageEnglish

Related product manuals