2.1.- SITE AND SHIPPING GUIDANCE
2.- INSTALLATION
Todas las operaciones de INSTALACIÓN, SERVICIO Y MANTENIMIENTO deben ser realizadas por
PERSONAL CUALIFICADO.
The unit must be transported in a HORIZONTAL POSITION on its metal bedplate proles . Any other position may cause
serious damage to the machine.
When the unit is received, it should be checked to assure that there are no bumps or other damage, following the instructions
on the packaging. If there is damage, the unit may be rejected by notifying the LENNOX Distribution Department and reporting
why the machine is unacceptable on the transport agent’s delivery notice. Any later complaint or claim made to the LENNOX
Distribution Department, for this type of anomaly, cannot be considered under the Guarantee.
Sufcient space must be allowed to facilitate placement of the unit. The unit may be mounted outdoors. There should be
adequate drainage around the unit.
In heat pump units during defrost cycle, the units produce a great amount of water melting the ice off coils.
If you wish to drain the water, adequate drainage should be installed behind the unit to collect and carry out the water where
desired.
When positioning the unit, be sure that the Rating Plate will always be visible since this data will be
necessary to assure proper maintenance.
It is advisable to unpack the unit at the place where the unit is going to be installed, to avoid damages during manage.
2.2.- UNIT LIFTING
How to hoist the unit
If unloading and placement requires the use of a crane, then secure the suspension cables as shown in the gure.
The unit can only be lifted and moved by its base.
NOTE: Use slingers of 6 m with the hook in order to prevent pressure on the top of the unit because it can be damaged.
Whenever it is possible, use balance beam.
Hook
WITH HOOK WITH BALANCE BEAM
Sling 6m
Hooker
Balance
beam
Sling
Crane
Crane