TYPICAL UNIT CONTROL WIRE CONNECTIONS
5
WIRE RUN LENGTH AWG# INSULATION TYPE
LESS THAN 100’ (30M) 18 TEMPERATURE RATING
MORE THAN 100’ (30M) 16 35°C MINIMUM
A
RUN CONTROL WIRES THROUGH RIGHT CUTOUT.
B RUN CONTROL WIRES THROUGH WIRE TIES.
MAKE CONTROL WIRE CONNECTIONS USING FIELD
PROVIDED WIRE NUTS. SEE FIGURE 3 FOR CONNECTION
REQUIREMENTS.
C
D
TIGHTEN WIRE TIE TO SECURE 24VDC CONTROL WIRING.
NOTE - FOR PROPER VOLTAGES, SELECT THERMOSTAT WIRE (CONTROL
WIRING) GAUGE PER TABLE ABOVE.
NOTE - WIRE TIE PROVIDES LOW VOLTAGE WIRE STRAIN RELIEF AND
MAINTAINS SEPARATION OF FIELD INSTALLED LOW AND HIGH VOLTAGE
CIRCUITS.
NOTE - DO NOT BUNDLE ANY EXCESS 24VAC CONTROL WIRES INSIDE
CONTROL BOX.
K1
CONT
ACTOR
CONTROL BOX
ROUTE THROUGH
WIRE TIES
LOW VOLTAGE
CONTROL WIRING
ROUTE EARTH GROUND
THROUGH LEFT CUTOUT
AND CONNECT TO
GROUND LUG.
HIGH VOLTAGE
WIRING
RIGHT CUTOUT
TIGHTEN
WIRE TIES
C
D
A
B

Other manuals for Lennox ELP Series

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Lennox ELP Series and is the answer not in the manual?

Lennox ELP Series Specifications

General IconGeneral
BrandLennox
ModelELP Series
CategoryHeat Pump
LanguageEnglish

Related product manuals