EasyManuals Logo
Home>Manitowoc>Construction Equipment>31000

Manitowoc 31000 User Manual

Manitowoc 31000
126 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #97 background imageLoading...
Page #97 background image
Reference Only
Manitowoc Published 07-23-15, Control # 078-03 4-73
31000 LUFFING JIB OPERATOR MANUAL SET-UP AND INSTALLATION
4
3
Information below from drawing A19443, Sheet 28:
Slowly boom down as the upper boom point wheel (A) contacts the ground and rolls towards the crane.
When the upper boom point (B) rotates into position against the load pins (C), reinstall the locking pins (D).
As required, install aircraft warning flag (E), warning light (F), and wind speed indicator (G).
4
This completes the Method 1 upper boom point installation procedure.
Step Action
FIGURE 4-79
Item Description
A Upper boom point wheel.
B Upper boom point.
C Load pin.
D Locking pin.
E Aircraft warning flag.
F Warning light.
G Wind speed indicator.
Boom down
A
B
C
D
E
F
G

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Manitowoc 31000 and is the answer not in the manual?

Manitowoc 31000 Specifications

General IconGeneral
BrandManitowoc
Model31000
CategoryConstruction Equipment
LanguageEnglish

Related product manuals