EasyManuals Logo
Home>Midea>Air Conditioner>Vertu series

Midea Vertu series User Manual

Midea Vertu series
54 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #28 background imageLoading...
Page #28 background image
26
3. Air purging.
Open the valves on the charging cylinder and the charge set. Purge the air by loosening the flare nut on
the 2-way valve approximately 45’ for 3 seconds then closing it for 1 minute; repeat 3 times.
After purging the air, use a torque wrench to tighten the flare nut to on the 2-way valve.
4. Check the gas leakage.
Check the flare connections for gas leakage.
5. Discharge the refrigerant.
Close the valve on the charging cylinder and discharge the refrigerant until the gauge indicates 0.3 to 0.5
Mpa.
6. Disconnect the charge set and the charging cylinder, and set the 2-way and 3-way valves to the open
position.
Be sure to use a hexagonal wrench to operate the valve stems.
7. Mount the valve stems nuts and the service port cap.
Be sure to use a torque wrench to tighten the service port cap.
Be sure to check the gas leakage.
6.7 Balance refrigerant of the 2-way, 3-way valves

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Midea Vertu series and is the answer not in the manual?

Midea Vertu series Specifications

General IconGeneral
BrandMidea
ModelVertu series
CategoryAir Conditioner
LanguageEnglish

Related product manuals