1
1
21
Subject to modications
9. IMPLEMENT HITCHING
This operation must be carried out by the driver, who must leave the seat and ensure
all manoeuvres are forbidden while he is working on the loader.
— Make sure that the locking pins are in hitching position (1).
The springs are compressed.
PLEASE NOTE: make sure that the implement’s hoses
are well clear of the hitching area.
— Approach the loader in line with the implement.
— Fit the implement carrier onto the implement.
— Crowd and continue to advance until the locking pins
are engaged.
— Stop the engine.
— Decompress the hydraulic lines supplying the implement.
NOTE: if the loader is equipped with a solenoid valve,
switch on the ignition and press the control button.