NMC-DC
INSTALLATION MANUAL
Page: of 109 pagesRevision: 01 IDoc. Name: NMC-DC I Installation Manual
Crop Management Technologies
Measure delay:
On delay= time it takes for water to get through the system.
Off Delay= time after irrigation it takes for water to fully drain
and stop drain measurement.
Option A- Total Measurement
Option B- Sample Measurement
Sample
Collect sample from drain of 1 lateral=simulate the total amount of drain water per valve/shift
Total Flow
10.3 Drain Meter Measurement (Drain applications for greenhouses)
62