18
IV. Trial running
1.Trial running must after all the installation completed.
2.Please confirm the following matters before the trial operation, put “√”in the boxes after
confirmation
Unit is installed correctly
Power supply meets unit’s rated power source need
Piping and wiring are correctly installed
Unit air inlet/outlet well-ventilated
Drain off water is done well
Leakage protective device act effectively
Pipe thermal insulation
Grounding wire connected correctly
3.After check and ensure correct, then power on. If the control panel display nothing, that should
recheck and tight the line of control panel. The control panel should display time, setting
temperature and the current temperature.
4.Discharge the air out of the pipelines , and then press ON/OFF button, the unit work under the
setting temperature, unit’s trial running would check the following:
First time to run the device, check the current normal or not;
The function keys on operation panel are normal or not;
The indicator light is normal or not;
The whole circulating hot water system has water leakage or not;
The condensed water discharge is normal or not;
System’s pressure is normal or not (according to the high water temperature or low
pressure);
Whether there is abnormal sound and vibration during operation;
The wind, sound and condensate of the unit affect the neighborhood or not;
Whether there is leakage of refrigerant.

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Nulite NL-BKDX40-150II/R32 and is the answer not in the manual?

Nulite NL-BKDX40-150II/R32 Specifications

General IconGeneral
BrandNulite
ModelNL-BKDX40-150II/R32
CategoryHeat Pump
LanguageEnglish

Related product manuals