7 - 7 BODY
INSTALLATION OF SCUFF GUARDS (CONTINUED)
4. Finishing the scuff guard
• Drill out the back hole.
• Insert the bolt.
• Put on the nuts
• Tighten the fasteners just tight enough to not
deform the scuff guards.
5. Finished e2
6. 4 Pass
• Once the panels and tub are bolted together
the scuff guards can be assembled.
• Measure down from bolt number 3 on the
front side panel 5 inches.
GEM Service Manual November 2007