Start up
We assume the machine has been properly installed.
Open the water tap and switch on the main electrical switch (not included to delivery).
Turn the on/off switch (Fig. 1 – pos. 7) from position 0 to position 1.
Wait until the boiler pressure gauge (fig. 1-pos.8) reads the working pressure (app. 0.9 bar) and group
display (fig. 1 – pos. 3)reads app. 103°C.
Open the steam handle (Fig. 1 - pos. 1) for some seconds and then close it. This operation avoids milk
resuction into the boiler. Wait until the working pressure has been reached again .
Your machine is now ready to work.