2.
this. These are on the side of the table and the pro
tective guard. Fasten the guard with seven Phillips
head screws, clamping brackets and nuts. Fit the
3.
them with eight Phillips head screws, clamping
brackets and nuts.
4.
lips head screws, clamping brackets and nuts.
m IMPORTANT!
10. Initial operation
during splitting work, fasten it to the table with two
•
•
•
•
• the oil level and
•
10.1 Checking the oil level (Fig. 15)
mm below the oil tank surface. If the oil level is at
the lower notch, then the oil level is at a minimum.
level. The machine must be on level ground. Screw
10.2 Ventilation screw
machine,
tem being compressed after being decompressed.
Such continuous compression/decompression will
machine. Before moving
machine, make sure the bleed screw is tight
ened to avoid oil leaking from this point.
•
m ATTENTION
The device and packaging materials are not toys!
Children must not be allowed to play with plas-
tic bags, lm and small parts! There is a risk of
swallowing and suocation!
9. Attachment / Before starting the
equipment
At least two people are required to install the de-
vice.
9.1 Installing the handle (4)
(enclosed accessories bag a) (g. 3)
screws.
9.2 Installing the protective guard (L)
(enclosed accessories bag b) (g. 4 + 5)
1.
2.
cated on the wheel bracket.
3. Fasten the other end of the strut to the protective
4.
9.3 Installing the tray table (K + M) (enclosed ac-
cessories bag c + d + e) (g. 6 + 7 + 8)
1.
2. Ensure that the table and the protective guard are
level in relation to each other.
3.
4. Fasten the other end of the strut to the protective
guard using the Phillips head screw and nut, align
5.
the screw and the foot bracket, tighten the screw
6.
7. Align both tables in relation to each other and use
9.4 Installing the guard (E - J)
(enclosed accessories bag f) (g. 9 + 10)
1.