EasyManuals Logo
Home>SMC Networks>Chiller>HRZ001-L

SMC Networks HRZ001-L User Manual

SMC Networks HRZ001-L
98 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #69 background imageLoading...
Page #69 background image
HRX-OM-I051
Chapter 7 System Maintenance
HRZ Series 7.3 Storage
7-3
7.2.2 Quarterly inspection
Table 7-3 Quarterly Inspection
Inspection item
Inspection method
Circulating fluid
Circulating fluid is to be drained for check.
Fluid should be free of particles, moisture
*1
and foreign
substances.
For ethylene glycol solution, confirm that the concentration falls
within the specified range.
Recommended to replace the water.
Facility water
Facility water quality should fall within the standards specified.
Ventilation hole and
electrical parts
No particles and dust should be present.
7.3 Storage
The following should be performed for system long-term storage.
1. Drain the circulating fluid. See section 7.3.1 Draining of circulating fluid
out of tank” for details.
2. Drain the facility water. See section 7.3.2 Draining of facility water” for
details.
3. Cover the system with a plastic sheet for storage.
Quarterly inspection requires an advance lockout/tagout of this
system. See section 1.5.3 Lockout/Tagout” in “Chapter 1 Safety” for
details.
Moisture trapped in the fluorinated fluid (*1) freezes in the heat
exchanger element and piping, which may lead to system failure.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the SMC Networks HRZ001-L and is the answer not in the manual?

SMC Networks HRZ001-L Specifications

General IconGeneral
BrandSMC Networks
ModelHRZ001-L
CategoryChiller
LanguageEnglish

Related product manuals