Commissioning
6.1 Inspection Before Commissioning
Check the following items before starting the optimizer:
All equipment has been reliably installed.
All cables are corrected connected.
Please check the input and output terminals of all optimizers for reversed connection.
All warning signs & labels are intact and legible
6.2 Commissioning Procedure
If all of the items mentioned above meet the requirements, set the optimizer on iSolarCloud
App. For details, please refer to the iSolarCloud App User Manual. Scan the following QR
code to obtain the iSolarCloud App User Manual.
If there is no topology, the short-circuit current of PV modules shall be no less than
2A. Therefore, please create a plant without topology under good irradiance
conditions.

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Sungrow SP600S and is the answer not in the manual?

Sungrow SP600S Specifications

General IconGeneral
BrandSungrow
ModelSP600S
CategoryInverter
LanguageEnglish

Related product manuals