48
BBK-V.122018_ENG People First...
EVERLASTING COMPANY
EVERLASTING
WE
COMPANY
AREYOUR
EVERLASTING
WE
COMPANY
AREYOUR
5.11. General Maintenance Schedule
Check all the Pressure, Temperature Sensors and Gauges
Check the Radiator Fan and its Blades
400 hours
1000 hours
Check the Control Panel and Generator Set Controller Unit
Check whole Fuel System for any Fuel Leakage
Drain the Water inside "Water Seperator Filter"
Check the Injector Nozzles
Perform a General Cleaning on whole Generator Set
Check for any Strange Noise when the Engine is Running
Check and Clean the Oil Pan Breather Hose
Check the Tensions of V-belts
Check any Screws or Bolts used for Assembling Purposes
Check the Compression Pressure (if necessary)
Check the Cleanliness of Radiator
AIR INLET AND EXHAUST SYSTEM
Check whole Air System for any Leakage (hoses, clamps, etc..)
Periodically (Engine Running Hours)
Clean or Change Air Filters
Check whole Exhaust System for any Leakage (pipes, spiral, etc.)
2000 hours
Daily
Start up
First Maintenance
(50 hours / 6 months)
200 hours
GENERAL MAINTENANCE SCHEDULE
ENGINE LUBRICATION SYSTEM
Check the water heater blocks
Check whole Cooling System for any Coolant Leakage
Every Year
Every 2 Years
Check the Colour of Exhaust Smoke