Giving Demos of Advanced Oscilloscope Features
DemoIX:SettingUpI
2
C Signals
1. Connect the ground lead of a pro be to a
point labeled GND on the D emo 2 board.
Connect the probe from channel 1 on the
oscilloscope to the I2C CLK test point on
the Dem o 2 bo ard.
2. Connect the ground lead of a secon d probe
to a point labeled GND on the Demo 2
board.
Connect the seco nd probe from channel 2
on the oscilloscope to the I2C DATA test
point on the Demo 2 board.
26 Demo 2 Board Instruction Manual

Table of Contents

Other manuals for Tektronix DPO3000 Series

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Tektronix DPO3000 Series and is the answer not in the manual?

Tektronix DPO3000 Series Specifications

General IconGeneral
BrandTektronix
ModelDPO3000 Series
CategoryTest Equipment
LanguageEnglish

Related product manuals