EasyManua.ls Logo

Triumph NTO-9AE User Manual

Triumph NTO-9AE
35 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #3 background imageLoading...
Page #3 background image
IMPORTANT NOTES
Do not install this lift on an asphalt surface.
Do not install this lift on any surface other than concrete confirming to minimum
specifications.
Do not install this lift over expansion joints or cracks. Check with an engineer.
Do not install this lift on a second floor with a basement beneath without written
authorization from an engineer.
This lift is only as good as the floor you put it on. A good level floor is
recommended for proper lift installation and operation. Concrete should be a
minimum of 4” thick and 3,000psi tensile strength with steal or fiber mesh
reinforcement.
The lift is intended to raise the entire body of the vehicle. Do not attempt to lift
only part of the vehicle. Improper use of this equipment could result in damage
to the lift, yourself or other property.
The lift is intended to lift vehicles only. It is not designed to lift any person or
equipment containing people.
Users of this equipment should be qualified, responsible and should follow the
operation and safety guidelines set forth in this manual.
Improper installation can cause damage or injury. Manufacturer will not assume
liability for loss or damage of any kind, expressed or implied, resulting from
improper installation or use of this product. Read the installation and operation
manual in its entirety before attempting to install the lift.
3
Floor Plate/Overhead Style Lifts

Other manuals for Triumph NTO-9AE

Questions and Answers:

Triumph NTO-9AE Specifications

General IconGeneral
BrandTriumph
ModelNTO-9AE
CategoryLifting Systems
LanguageEnglish

Summary

IMPORTANT NOTES

DEFINITION

PREPARATION

GENERAL INFORMATION

IMPORTANT CONCRETE AND ANCHORING INFORMATION

ANCHORING TIP SHEET

INSTALLATION INSTRUCTIONS

RAISE THE LIFT

LOWER THE LIFT

SAFETY PROCEDURES

MAINTENANCE SCHEDULE

DAILY PRE-OPERATION CHECK (8 HOURS)

Daily checks of safety latches, hydraulics, chains, cables, and wiring for proper function.

WEEKLY MAINTENANCE (40 HOURS)

Weekly checks on anchor bolts, floor, oil level, and pulley assemblies for wear and tightness.

YEARLY MAINTENANCE

Annual lubrication, hydraulic fluid change, and component wear inspection.

TROUBLE SHOOTING

OWNER / EMPLOYER RESPONSIBILITIES

Parts list

Related product manuals