6-6 BA EZ17 en* 1.1 * ez17t600.fm
6 Transportation
1. – see chapter “ Crane-lifting” on page 2-12
2. Fit an empty bucket and lock it safely.
3. Remove all dirt from the machine.
4. Park the vehicle on firm, level, and horizontal ground.
5. Tilt in bucket.
6. Raise the loader unit completely.
7. Pull the stick toward the machine.
8. Raise the stabilizer blade completely.
9. Position the boom straight ahead at the center of the machine.
10.Rotate the upper carriage by 180° so that the stabilizer blade points to
the rear.
11.Lock the revolving superstructure- see Revolving superstructure lock.
Position the boom s traight ah ead at the center o f the mac hine.
12.Stop the engine.
13.Operate the control lever repeatedly to release the pressure in the
hydraulic system.
14.Raise the control lever base.
15.Remove the starting key and carry it with you.
16.Safely store all loose objects.
17.Leave the vehicle and close and lock all covers.
18.Attach slings on the lifting eyes.
19.Slowly raise the machine until there is no more contact with the
ground.
20.Let the machine swing until it comes to rest.
21.If the machine balance, and the condition and position of the slings is
correct, slowly raise the machine to the required height and load it.
Mandatory lengths L of the lifting gear:
Length Dimension
L Minimum 1300 mm (51 in)