Benchmark Platinum-Edge [ii]: Installation Manual
SECTION 2 INSTALLATION
OMM-136_E • GF-210 12/13/2019 Technical Support • (800) 526-0288 • Mon-Fri, 8 am - 5 pm EST Page 28 of 57
2.9 GAS SUPPLY PIPING
AERCO’s Benchmark Gas Components and Supply Design Guide, TAG-0047 (GF-2030)
must be consulted prior to designing or installing any gas supply piping.
WARNING!
Never use matches, candles, flames or other sources of ignition to check for gas leaks.
CAUTION!
Many of the soaps used for gas pipe leak testing are corrosive to metals. Therefore, piping
must be rinsed thoroughly with clean water after leak checks have been completed.
NOTE:
All gas piping must be arranged so that it does not interfere with removal of any covers,
inhibit service/maintenance, or restrict access between the unit and walls, or another unit.
BMK Model
Natural Gas Piping
Propane Piping
750 and 1000
1 inch (2.54 cm) in back of unit
1 inch (2.54 cm) in back of unit
1500 3000
2 inch (5.08 cm) on top of unit
1 inch (2.54 cm) on top of unit
4000
2.5 inch (6.35 cm) on top of unit
N/A
5000 and 6000
2 inch (5.08 cm) in back of unit
3-inch (7.62 cm) LGP in back of unit
1-1/2 inch (3.81 cm) on top of unit
Prior to installation, all pipes should be de-burred and internally cleared of any scale, metal
chips or other foreign particles. Do NOT install any flexible connectors or unapproved gas
fittings. Piping must be supported from the floor, ceiling or walls only and must not be supported
by the unit.
A suitable piping compound, approved for use with natural gas, should be used. Any excess
must be wiped off to prevent clogging of components.
To avoid unit damage when pressure testing gas piping, the unit must be isolated from the gas
supply piping. A thorough leak test of all external piping must be performed using a soap and
water solution or suitable equivalent. The gas piping used must meet all applicable codes.
2.9.1 Gas Supply Specifications
AERCO Benchmark Low NOx series boilers require a stable natural gas and propane input
pressure. It must comply with the allowable gas inlet pressure range specified in the Benchmark
Pre-Installation Gas Supply Guide (TAG-0047, GF-2030).
2.9.2 External Gas Supply Regulator
An external gas pressure regulator is required on the gas inlet piping under most conditions
(see, below). Regulators must conform to the specifications in the Benchmark Pre-Installation
Gas Supply Guide (TAG-0047, GF-2030).

Other manuals for Watts Aerco Benchmark Series

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Watts Aerco Benchmark Series and is the answer not in the manual?

Watts Aerco Benchmark Series Specifications

General IconGeneral
BrandWatts
ModelAerco Benchmark Series
CategoryBoiler
LanguageEnglish

Related product manuals