1034349-UCL-B-0814
Unitary Products Group 3
REFERENCE
General Inspection Completed See Notes
Unit inspected for shipping, storage, or rigging damage
Unit installed with proper clearances
Unit installed within slope limitations
Refrigeration system checked for gross leaks (presence of oil)
Terminal screws and wiring connections checked for tightness
Filters installed correctly and clean
Economizer hoods installed in operating position
Condensate drain trapped properly, refer to Installation Manual
Economizer damper linkage tight
Gas Heat vent hood installed
All field wiring (power and control) complete
Air Moving Inspection Completed See Notes
Alignment of drive components
Belt tension adjusted properly
Blower pulleys tight on shaft, bearing set screws tight, wheel tight to shaft
Pressure switch or transducer tubing installed properly
Exhaust Inspection Powered Barometric Relief Completed See Notes
Check hub for tightness
Check fan blade for clearance
Check for proper rotation
Check for proper mounting (screen faces towards unit)
Prove operation by increasing minimum setting on economizer
Economizer Inspection Standard BAS Completed See Notes
CO
2
sensor installed Yes No
Check economizer setting A B C D
Prove economizer open/close through PC or Control Module
Reheat Mode Normal or Alternate Not Applicable
Humidistat Location _____________________________________________
Note: BAS System Control Reheat through Intellicomfort/VAV Board