AP3/30_AP3/50_AP3/80_AP3/100_Instructions. V1.01 Page 10 August / 2012
Positioning
The Zip Aquapoint should be installed vertically with the electrical cover panel and water
connections underneath.
Theunitisdesignedtobewallmountedusingthewallxingssuppliedwiththeproduct.
Ensurethatthewallwheretheunitistobelocatedissufcientlystrongtosupportthefull
weightoftheunit(seedimensions)andcapableofacceptingsuitablexings.
PositiontheZipAquapointtoallowforprovisionofthecoldwatersupply,dischargettings
and pipework as well as access for future maintenance, repair of the unit or its replacement.
Reasonable clearance will be required to give access to pressure controls, element assembly,
draining facility, pipe connections and expansion vessel.
A gap of 250mm should be left between the top of the unit and the ceiling. A gap of 350mm
shouldbeleftbetweenthebottomoftheunitandanyoororworksurface.
Do not install in a location where the unit or connecting pipework can freeze.
FixtheZipAquapointhotwatercylinderlocatingbrackettothewallwithsuitablexingsas
shown in the diagram and table of dimensions below.
A B C
AP3/30 525 310 240
AP3/50 690 470 250
AP3/80 950 735 245
AP3/100 1125 900 245
Position the Zip Aquapoint securely on the locating bracket.
Theexpansionvesselshouldbesecurelyttedtoasuitableandconvenientwallusingthe
ttingssuppliedandpositionedtoenableitsconnectiontothecoldinletset.
All dimensions in mm