Installation, Administration and Maintenance
Aastra Telecom Page: 23 (47)
3.1.6 State graph of the start up phases
Start-up
wait for link up
LED RED ON
retry
Wait for 60 seconds
LED red
flashing 0,25 Hz
pplication
Init
lication
Connect to OMM
pplication
Synchronize DECT
pplication
Up & running
LED green
flashing 2 seconds
on / 50ms off
LED green
LED green
flashing 1 Hz
LED green
flashing (0,5 Hz)
TFTP
File download
LED red
flashing 2,5 Hz
DHCP no answer / offer not o.k.
TFTP failed
Connection attempt to OMM failed
Failure, i.e. connection to OMM lost
Failure, i.e. connection to OMM lost
DHCP
wait for reply
LED orange
DHCP no answer; offer not o.k.
(try 3 minutes)
Init failed
BOOTER
Kernel
DHCP
wait for re
l
LED red
flashing 0,5 Hz