Check the Power Section 4 Troubleshooting
76 9ARD000015-600
Check the Power
Check trunk and drop current limits.
Check type (size and length) of cable bringing power into the trunk.
Measure the 24V supply at the middle and ends of the network.
Consider spot checking the power for noise with an oscilloscope.
The 24 VDC Network Power for DeviceNet Must be for the DeviceNet
network only.
Check the Wiring
Check lead dress in junction boxes.
Check that connectors are screwed together tightly.
Check that glands are screwed tightly.
Check for foreign material (electrical tape, RTV, etc.) in glands.
Check that nodes are not touching extremely hot or cold surfaces.
Check that cables are kept a few inches away from power wiring.
Check that cables are not draped on electric motors, relays, contactors or
solenoids.
Check that cables are not constrained so as to place excessive tension on
connectors.
Wiggle connectors to provoke intermittent failures.
Check the Scanner Configuration
•Baud Rate.
Node Address.
Check the Nodes
Drop 24V supply, re-power and reset the scanner to initialize the network.
Examine the scanner display codes to identify problem nodes.