38
1ZSE 5492-115 en, Rev. 5
fm_00083
A3.4 Welding of the ange and mounting of the pressure relay
Weld the ange and install the pressure relay on the tank.
Appendix A
3 Welding and mounting instruction
Flange
LL 114 006-9
Hole in wall
Ø 20-70 mm
O-ring
Test tap
Quickcoupling
Three way valve
Pressure relay
LL 114 009
Stud M10x40 nut
and washer
Tight welded
Fig. A10. Attachment of pressure relay.

Table of Contents

Other manuals for ABB UZE

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the ABB UZE and is the answer not in the manual?

ABB UZE Specifications

General IconGeneral
BrandABB
ModelUZE
CategoryIndustrial Equipment
LanguageEnglish

Related product manuals