Commissioning of the appliance
23
Tronic 4000 – 6721830066 (2021/06)
▶ Place the cables from the operating panel into the cable
conduit.
Fig. 40
▶ Place the cover on the appliance.
Fig. 41
▶ Tighten the fixing screw on the cover of the appliance.
Fig. 42
Fig. 43
7 Commissioning of the appliance
7.1 First commissioning of the appliance
NOTICE
Risk of damage to the appliance!
The initial commissioning of the appliance must be carried out
by a qualified expert who will provide the customer with all the
information required for its proper operation.
▶ Turn on the cold water inlet.
▶ Check the tightness of all connections.