PERIODIC MAINTENANCE
6095756-R2 EN
2000-Hour Maintenance
After each 2000 hours of truck operation, in addition to the
daily and 1000-hour maintenance, perform the following
maintenance procedures:
Check all rotation bearing capscrews for proper torque
value. See Technical Bulletin TB183 for checking and
replacement procedures.
Inspect all arm and cylinder pivot pins for wear.
Replace if necessary.
4000-Hour Maintenance
After each 4000 hours of truck operation, in addition to
the daily, 1000 and 2000-hour maintenance, perform the
following maintenance procedures:
Due to normal mechanical wear and component service
life, cylinder seals should be replaced to maintain
performance and safe operation. Refer to H-Series
Fixed Frame Pivot Arm Paper Roll Clamp Service
Manual 6078255, Section 4.4, for cylinder service.
WARNING: After completing any service
procedure, always test the attachment
through five complete cycles. First test
the attachment empty, then test with a load
to make sure the attachment operates
correctly before returning it to the job.
1000-Hour Maintenance
(continued)
Inspect all arm, frame and cylinder pivot bushings for wear.
Replace if necessary.
Inspect all load bearing structural welds on arms, swing
frame pivots, arm pivots and cylinder pivot areas for visual
cracks. Replace components as required.

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Cascade H Series and is the answer not in the manual?

Cascade H Series Specifications

General IconGeneral
BrandCascade
ModelH Series
CategoryPower Tool
LanguageEnglish

Related product manuals