Figure 19: Patch Panel Front iew with Brackets
Figure 20: Patch Panel Rear View with Brackets
Step 3 Secure the brackets to the patch panel with the screws removed when performing Step 3. The recommended
maximum torque is 28 in.-lb (3.16 N-m).
Step 4 Position the cable management guides against the mounting brackets on the patch panel, see the figure below.
Installing the Cisco ASR 920 Series Router
23
Installing the Cisco ASR 920 Series Router
Installing Patch Panel