GenReadyToLoad signal is activated or
generator voltages are in allowed limits) and then GCB is reclosed
AMF sequen
• Controller waits for gen-set parameters are OK (means
ce (simplified)
State Condition of the transition Action Next state
Mains
operation
Mains failed
1
MCB CLOSE/OPEN off
EmergStart Del timer
Mains failure
started
Mains voltage and frequency OK
CLOSE/OPEN on Mains operation MCB
Mains
failure
art s
performed, th
E
Island operation EmergStart Del elapsed
Engine st equence
en
/OPEN on
2
GCB CLOS
Island
operation
uency OK D Mains return Mains voltage and freq MainsReturn
started
el timer
Mains failed Island operation Mains
return
e stop
3
Mains operation MainsReturnDel elapsed GCB CLOSE/OPEN off,
then MCB CLOSE/OPEN
on and then engin
sequence performed
1
Mains failed means mains over/under -voltage, over/under -frequency, voltage assymetry (preset
closed and start-up sequence is
ed.
, MCB opened and
See also chapters: Circuit breakers timing
delay must elapse)
2
If during start-up sequence mains returns, then MCB is re
interrupt
3
If mains fails during stop procedure (cooling) again, stop sequence is interrupted
GCB reclosed.
and AMF time chart.
WARNING!
If an red alarm is present and the gen-set is in AUT mode, it can start by self after all red alarms